Carnew Town Plan 2022 – 2028
Carnew is a designated Level 5 Small Town (Type 1) settlement.
Level 5 Small Town Plans form part of the County Development Plan 2022-2028 (Volume 2). All Level 5 Small Town Plans should be read in conjunction with the Introduction to Level 5 Town Plans.
The Town Plan was adopted on 12 September 2022, it came into effect 23 October 2022 and a Ministerial Direction was issued on this plan 21 February 2023.